The 506 m long steel bridge, consisting of eight spans, was designed by Stefan Szyller. Its construction, started in 1904, was supervised by engineers Mieczysław Marszewski and Wacław Paszkowski.
Stamp Issue: 1966-09-15
number 1560
Between 1963 and 1966 the bridge was widened, a tram track was separated from the carriageway and the bridge was connected to the "Wisłostrada" expressway on the left bank of the Vistula by means of a long looping sloped roadway section which reminded some contemporary commentators of a snail's shell.

Stamp Issue: 1970-05-08
Cp 438

0 coments:
Post a Comment