Third Guards Brigade 'Kune' Bridge
The A5 Highway on the Beli Manastir - Osijek - Svilaj (r. Sava) route, a component of the C5 branch of the European network carrying the following mark: E73, which is located on the west side of the city of Osijek, near Petrijevci, was supposed to bridge the Drava River and its inundation area. So as not to create a barrier to the future expansion of Osijek, as well as to the possibility of building a hydroelectric power plant on the r. Drava, as a result of a process of choosing a crossing project solution, a bridge with a total length of 2,485 (2,507) m and access viaducts was created. What is interesting is that the Drežnik viaduct near Karlovac is the same length as the "Kune" Bridge, so these two objects share the first place in Croatia with regards to their size. By comparison, the Pelješac Bridge is 2,440 m long.
The bridge consists of three parts: a) the Baranja side access road over the inundation (length: 1,074.5 m, 28 + 29 x 35 + 31.5 m), b) the bridge crossing the Drava river (length: 420 m, 100 + 220 + 100 m), and c) the Osijek side access road (length: 990.5 m, 24.5 + 28 + 26 x 35 + 28 m). Both access roads were built as two separate viaducts, one for each direction. They have span structures made of prestressed T-section concrete supports (height: 1.85 m), with six of them in cross-section, and are connected with a 25 cm thick pavement slab, supported with two Φ 1.8 m columns lying over the overhead beams. The foundations are based on drilled pylons (Φ: 1.5 m). The span structures of both access roads are divided into six expansion units. The center of the object is the part that bridges the Drava, which has been designed with a suspended span construction, with spans of 100 m + 220 m + 100 m, and 75 m tall type A pylons. The pylons are made of reinforced concrete, with a 4 x 5 m (at the top: 3.5 x 6 m) section of arms. From pylons on both sides, a row of 10 diagonal tension rods composed of high-quality steel ropes descends and stretches across. The tension rods are protected by ribbed HDPE pipes. The pylon arms are based on two batches of 25 drilled pylons with a 1.5 m diameter. The span construction of this part, which consists of a three-chamber steel box girder with a cross-section of approx. 12 x 2.8 m, and 8.3 m long prominent consoles supported by steel beams, is supported by the tension rods described, which transmit force to the pylons. The tension rods connect to the span structure in the central chamber of the structure. The total width of the span structure in this part (420 m) is 28.6 m.
The authors of the Concept Project are Peter Sesar, Ph.D. (Civil Engineer) and Damir Tkalčić, M. Sc., while the author of the Main Project is Damir Tkalčić, M.Sc. The construction works were performed by a business association consisting of the following companies: Viadukt d.d., Zagreb; Osijek Koteks d.d., Osijek; Konstruktor Inženjering d.d. and Skladgradnja grup d.d., (both from Split), as well as Hidroelektra - Niskogradnja d.d., Zagreb. The labor contract price of the project in 2009 was approx. 950 million HRK.
Stamp Issue: 2023.03.20
No comments:
Post a Comment